CMMC Level 1 vs Level 2 comes down to the information your contract has you handle: Level 1 covers Federal Contract Information, and Level 2 covers Controlled Unclassified Information.
Our guide to CMMC requirements for small business covers the whole program. This page does one job. It helps you pick between the two levels a supplier meets most often, and find the line in your own paperwork that settles it, whether that paperwork is a solicitation from an agency or a subcontract from a prime.
It’s written for the rules as of November 2026, including a July 2026 class deviation. It’s readiness education only. We don’t certify anyone, at any level.

The information you handle sets the level
Federal Contract Information (FCI) is information, not meant for public release, that the government gives you or that you create for it under a contract. It leaves out public website content and simple transactional data such as payment details. Controlled Unclassified Information (CUI) is narrower: information a law, regulation or governmentwide policy says needs safeguarding or dissemination controls.
Level 1 reaches the systems that process, store or transmit FCI, and Level 2 reaches the ones that hold CUI. Plenty of suppliers hold both. Under 32 CFR 170.16, a Level 2 status also satisfies Level 1 for the same scope. A drawing marked CUI is the usual sign, and anything unmarked is worth asking about.
CMMC Level 1 vs Level 2 side by side
Level 2 comes in two forms, so the table has three columns. The rows come straight from 32 CFR 170.15, 170.16 and 170.17. Read the table. Then read your contract.
| What differs | Level 1 (Self) | Level 2 (Self) | Level 2 (C3PAO) |
|---|---|---|---|
| Information it protects | Federal Contract Information | Controlled Unclassified Information | Controlled Unclassified Information |
| Requirements | 15, from FAR 52.204-21 | 110, from NIST SP 800-171 Rev. 2 | 110, from NIST SP 800-171 Rev. 2 |
| Who assesses | Your company | Your company | A certified third-party assessor, called a C3PAO |
| Plan of action | None permitted | Narrow, for a Conditional status only | Narrow, for a Conditional status only |
| How often | Every year | Every three years | Every three years |
| Affirmation | After each assessment, then every year | After each assessment, then every year | After each assessment, then every year |
| Where results go | Your company enters them in SPRS | Your company enters them in SPRS, with a score such as 105 out of 110 | The assessor files them, and they pass to SPRS automatically |
| Evidence kept | Six years from the status date | Six years from the status date | Six years from the status date |
A fourth status, Level 3 (DIBCAC), sits above these three. It needs a Final Level 2 (C3PAO) first. This page doesn’t cover it.
Where your contract says which level applies
A solicitation says it in plain words. DFARS 252.204-7025 has a blank that the contracting officer fills with one of four entries: Level 1 (Self), Level 2 (Self), Level 2 (C3PAO) or Level 3 (DIBCAC). That level, or a higher one, is required before award for each contractor information system that will process, store or transmit FCI or CUI while the offeror performs the resulting contract. The resulting contract carries DFARS 252.204-7021, which repeats the level.
Miss it and the rule is blunt. An offeror without a current status at that level, plus a current affirmation in SPRS, the Supplier Performance Risk System, isn’t eligible for the award, so the status has to be in SPRS before award, not after you win.
If you’re a subcontractor
Your prime flows the level down, and 32 CFR 170.23 sets the floor. FCI only means Level 1 (Self); CUI means at least Level 2 (Self), and Level 2 (C3PAO) when the prime contract requires Level 2 (C3PAO) or Level 3. Ask your prime for the level in writing, and for the systems it covers. Don’t guess.


What each level asks of you once you know it
Level 1 is a yearly habit. Each year you self-assess all 15 requirements as MET, post the result in SPRS, and have your Affirming Official, the senior person who can affirm for the company, affirm that it holds. No plan of action is allowed at Level 1. A gap means no status, as 32 CFR 170.15 puts it.
Level 2 runs longer. A self-assessment lasts three years, with an affirmation every year, and a Conditional status expires after 180 days if the plan of action isn’t closed out under 32 CFR 170.16. A C3PAO keeps that calendar. Our guide to the Level 2 requirements reads all 110.
What the July 2026 class deviation changes
As of November 2026, DoD’s class deviation 2026-O0025 lets requiring activities include Level 1 (Self) or Level 2 (Self) assessments, and it suspends the November 2026 CMMC Phase 2 transition. It doesn’t rewrite your solicitation. Read the solicitation, then every amendment. Our post on what CMMC still requires explains the pause.
CMMC Level 1 vs Level 2 in four numbers
Each figure comes from the rule or the publication that sets it.
Sources checked November 21, 2026.
Where to read next on CMMC
Level 1, requirement by requirement
All 15 basic safeguards behind Level 1 are read in plain words in our Level 1 requirements guide.
Level 2, family by family
Our CMMC Level 2 requirements guide maps the 110 requirements to NIST’s 14 families and explains scoring.
A working checklist
Eight steps, each with the clause and the record behind it, in our CMMC compliance checklist.
Readiness with a person
Readiness guidance and referrals to certified assessors come through our CMMC and compliance readiness service.
Two posts on who CMMC reaches
- Does CMMC apply to my company? A first check before you pick a level
- CMMC flow-down to subcontractors, and what a prime will still ask
Questions suppliers ask when choosing a level
Can one company need both levels?
Sometimes, because the level attaches to each contract and the systems that touch its information, not to the company as a whole.
A contract that involves only FCI points to Level 1 (Self), and a CUI contract points to Level 2. The rule treats a Level 2 status as covering Level 1 for the same scope, so you won’t assess the same systems twice.
Does being a small shop get us the lighter level?
Size isn’t the test, because the rule ties the level to the information you handle and the level your contract names.
Nothing in 32 CFR 170.23 turns on company size. A small supplier that handles CUI is in Level 2 territory, and a large one that holds only FCI is in Level 1 territory.
What if the solicitation doesn’t name a level?
Ask the contracting officer in writing which level the contract requires and which systems it covers.
DFARS 252.204-7025 expects the officer to fill the level in, so a blank is worth a question, and an assumed Level 1 could leave a CUI contract short of the level it names. Ask early.
Can a Level 2 status stand in for Level 1?
For the same assessment scope, a Level 2 status also satisfies Level 1, and 32 CFR 170.16 says so directly.
Scope is the catch. Level 2 has to cover the systems your Level 1 contract names, and your contract still asks for its own level in SPRS.
How long does it take to get from Level 1 to Level 2?
A duration depends on facts about your company that no page can see, and the rule sets none.
What moves it: how many systems touch CUI, how much of the 110 you already meet and have written down, and who does the work. Scope first. Then ask your contracting officer or prime what date the contract needs.
Does the cluster certify us at either level?
We don’t certify anyone, at any level. Level 1 and Level 2 (Self) are self-assessments your company performs, and Level 2 (C3PAO) is done by a certified third-party assessor.
We provide readiness guidance and gap assessments, and we refer you to qualified assessors. Third-party CMMC assessments by certified assessors involve fees charged directly by those providers, not by the cluster. If a referral involves outside fees, your point of contact tells you before anything moves forward.
Sort out your CMMC level with the cluster
Membership and cluster-funded services are provided at no cost to eligible participating businesses, subject to program requirements and available resources.
