SBIR proposal template and checklist for a first Phase I

Twelve Technical Volume sections in the order the BAA sets, plus a check for every DSIP volume.

Grey unmanned underwater vehicle prototype on a padded cradle beside an indoor test tank in an engineering lab

An SBIR proposal template for a first DoD Phase I follows the twelve Technical Volume sections, in the order the Department of War’s 2027 SBIR BAA sets, inside a seven-volume package you build in DSIP.

This page is for Orange, Los Angeles and San Diego County small businesses writing a Phase I for the first time. Two steps come first. Register, then pick a topic, and our SBIR/STTR resources for defense small businesses walk through both.

DSIP is the Defense SBIR/STTR Innovation Portal, where every DoD proposal is built and certified. The rules below come from the 2027 BAA’s Release 2 preface and its Appendix A, which the Department of War posts on DSIP and which we read on November 25, 2026. Your topic’s component instructions win wherever they differ. Every time.

Pale grey conical radome on a test stand inside an anechoic chamber lined with grey foam cones

Which SBIR proposal template your topic uses

An SBIR proposal for a DoD topic is seven volumes built in DSIP: a cover sheet, a Technical Volume, a cost volume, a commercialization report, supporting documents, a training record and foreign-affiliation disclosures. Only the Technical Volume is a document you write from scratch. The rest are web forms, uploads or a short read.

Use the component’s template when it has one

Appendix A of the BAA is the format model for a Phase I Technical Volume, and the instructions from the component that wrote your topic take precedence over it wherever the two disagree. The Navy posts its own Volume 2 and Volume 5 templates on its SBIR links and forms page, and DARPA publishes a Phase I Technical Volume template of its own.

Page limits in Release 2 of the 2027 BAA

  • Navy: 10 pages, with any Phase I option inside the same ten.
  • DTRA allows 20 pages. Only the first 20 get read.
  • The Department of the Air Force sets a page or slide limit topic by topic, and pages past it aren’t reviewed.

Nothing posted by your component? Use Appendix A. And take the page limit from the topic’s own instructions, never from an old template file.

How evaluators read a Phase I Technical Volume

Section 4.2 of the BAA ranks three factors, most important first. Technical merit leads.

  1. The soundness, technical merit and innovation of your approach, and its progress toward the topic’s goal.
  2. The qualifications of your principal investigator, staff and consultants, including their ability to commercialize the results.
  3. The potential for government or private-sector use, and the benefits that follow from it.

Cost counts too. Reviewers use only what’s in the proposal, and the BAA tells you not to assume they know your company, your people or the experiments you ran before this topic opened. Website links and videos aren’t considered at all.

Where the pages go

Appendix A wants the statement of work to be “a substantial portion” of the volume. The commercialization strategy gets about one page, and our guide to turning SBIR technical results into buyer outcomes covers what goes in it. Resumes count toward the limit. So does everything else.

New in 2027: the BAA says evaluators may use support tools, including what it calls “super intelligence” technologies cleared for that work, to summarize proposals, flag strengths and weaknesses and check compliance with the solicitation, while government personnel make every final judgment. Use Appendix A’s headings. They’re easy to check.

Grey gimbaled sensor turret bolted to a vibration shaker table in an environmental test lab
Satellite instrument in gold-foil insulation on a cart at the open door of a thermal-vacuum test chamber

An SBIR proposal checklist for the other six volumes

DSIP calls a volume complete when its fields are filled. That isn’t the same as meeting your component’s rules, and the BAA warns about it twice. Check each one yourself.

  • Volume 2 format: one unlocked PDF, type no smaller than 10 point, one-inch margins, numbered pages, and a header with your company name, topic number and DSIP proposal number.
  • Volume 1, the cover sheet, holds a technical abstract and an anticipated-benefits section of 3,000 characters or fewer each. Keep both free of proprietary detail, since they may be posted publicly if you’re selected.
  • Volume 3 (cost): key people named with their hours, any Phase I option priced separately, and subcontractor costs in the same detail as your own.
  • Volume 4 is the Company Commercialization Report from SBIR.gov, needed only after an earlier Phase I or Phase II award.
  • Letters of support, data-rights paperwork and, for ITAR work, DD Form 2345 go in Volume 5.
  • Volume 6: the fraud, waste and abuse training, a 3-page PDF the proposal owner reviews once a year.
  • Volume 7 is the foreign-affiliation webform, and nobody can certify the proposal until it’s finished. Our security and foreign-ownership review guide walks through it.

Then the clock. Release 2 of the 2027 BAA pre-released on November 4, 2026, opens in DSIP on December 2 and closes at noon Eastern on January 6, 2027, and topic authors take direct questions only during pre-release. SBIR.gov’s proposal schedule tutorial suggests ten weeks and one topic for a first proposal. Get your SAM.gov registration active early, and our SAM.gov registration guide covers it.

The SBIR proposal template, section by section

Here’s Appendix A of the 2027 BAA as a working outline. Keep the twelve sections in this order, under these names, and delete the bracketed guidance before you upload.

SectionWhat to writeWatch for
1Identification and Significance of the Problem or OpportunityThe specific technical problem or opportunity in the topic, and why it mattersThe first screen is responsiveness to the topic’s objective, so tie every claim to it
2Phase I Technical ObjectivesThe specific objectives, including the questions the work will answer about feasibilityWrite questions Phase I can actually answer in its period of performance
3Phase I Statement of WorkTasks, how and where each is done, a schedule of major events, the final deliverables, and any option tasksAppendix A calls it “a substantial portion” of the volume; include subcontractor and research institution tasks
4Related WorkPrior work by your principal investigator, firm or consultants, with the client, a government point of contact and datesIt has to show you know the state of the art in the topic
5Relationship with Future Research or Research and DevelopmentAnticipated results, how Phase I sets up Phase II, and the clearances or approvals Phase II testing needsName those approvals now, with a plan to get them on time
6Commercialization StrategyAbout one page on the market need, its size, and a schedule of quantitative results you expectDoD, other federal and private-sector markets all count
7Key PersonnelEducation and experience for each key person, and a concise resume for the principal investigatorResumes count toward the page limit; leave out Privacy Act information
8Foreign CitizensAny foreign national or dual citizen on the project, with country of origin, visa or work permit, and roleWrite “None” if there are none; a missing answer can make the proposal nonresponsive
9Facilities/EquipmentThe instruments and facilities Phase I needs, and whether they meet federal, state and local environmental rulesJustify equipment here and price it in Volume 3
10Subcontractors/ConsultantsWho they are and which tasks they doSBIR: your firm does at least two-thirds of the Phase I work. STTR: at least 40 percent, plus 30 percent from one research institution
11Prior, Current, or Pending Support of Similar Proposals or AwardsAny substantially similar proposal or award, with the agency, dates, title, principal investigator and numbersIf none, say “No prior, current, or pending support has been provided for proposed work.”
12Identification and Assertion of Restrictions on Technical Data or Computer SoftwareA table of the data or software you’ll deliver with restrictions, the basis, the rights category and who asserts itThe 2027 BAA ties assertions to R-DFARS 252.227-7992; enter “none” if there are none, and only the table counts toward the limit

Source: Department of War 2027 SBIR BAA, section 3.7 and Appendix A, read November 25, 2026. Component instructions take precedence.

Four numbers from the 2027 SBIR BAA

Each figure comes from the announcement itself, read on DSIP November 25, 2026.

7

Proposal volumes in DSIP

BAA section 3.1, the volume list

12

Technical Volume sections, in order

BAA section 3.7(c)

3,000

Characters per cover-sheet section

BAA section 3.7(a), abstract and benefits

1

Proposal per topic, per company

BAA section 3.1, effective October 1, 2026

Where to go after the template

Four next reads, depending on what’s still open on your list.

SBIR/STTR funding assistance

Our SBIR/STTR funding assistance offers shaping guidance, technical review and feedback on proposals, not ghostwriting.

Pick a DoD topic first

A template only helps once you’ve chosen a topic, and our guide to reading DoD SBIR topics shows how.

Size the Phase I budget

Before you fill in Volume 3, check SBIR Phase I award size and timeline against your topic’s own figures.

SBIR or STTR rules

The two programs split the work differently, and our SBIR vs STTR guide shows which rules your topic carries.

What first Phase I teams ask about the template

Is there one SBIR proposal template every agency accepts?

There isn’t one, and even inside DoD the components differ.

Agencies outside DoD, NASA among them, publish their own formats. A DoD topic follows Appendix A of the 2027 BAA unless its component, as the Navy and DARPA do, posts a template of its own. Check the topic first.

How many pages can a Phase I Technical Volume run?

Ten pages for Navy topics in Release 2 of the 2027 BAA, and 20 for DTRA’s, while the Department of the Air Force sets its limit topic by topic.

Some components stop reading at the limit, and others can reject the whole Technical Volume. The number in your topic’s component instructions is the one that counts.

Do we need a Company Commercialization Report for our first proposal?

Not if your company has never received a Phase I or Phase II award from any agency. Answer no in Volume 4 and DSIP marks it complete.

Earlier awards change that. Then the firm admin uploads the report from SBIR.gov, even when nothing has been commercialized yet.

What happens if we send two proposals to one topic?

Only the last one counts. Since October 1, 2026, DoD evaluates just the most recent proposal a company certifies and submits to a topic before the deadline, and the earlier ones are ruled ineligible.

The rule covers SBIR and STTR, conventional and open topics alike.

Which part of the proposal do evaluators weigh most?

Short answer: the technical approach. The BAA ranks the soundness, merit and innovation of your approach first, then the qualifications of the people doing the work, then the commercial potential, and it considers cost as well.

Nothing off the page counts.

Where does the cluster fit in a first Phase I?

The cluster provides shaping guidance, technical review and feedback on proposals, not ghostwriting. The proposal has to reflect your company’s actual capabilities and research plan.

Members take it up with their point of contact. And the cluster isn’t a government agency, so it can’t promise an award.

Line up support before your topic opens

Membership and cluster-funded services are provided at no cost to eligible participating businesses, subject to program requirements and available resources.