You’ve probably read that the AFWERX Open Topic takes almost any technology, pays for a short Phase I, and opens a few times a year. That was the program from 2018 into 2025. It isn’t the program in late 2026.
If you’re weighing an AFWERX Open Topic as one step toward a program of record, start with what the solicitations say now. Everything below comes from the Air Force’s own instructions, the law, and a September 2026 GAO report, each read on November 25, 2026. Not from old slide decks. Those still circulate.
The short version. The last Air Force and Space Force open topics closed on August 5, 2025. AFWERX now says it’s moving to “focused” open topics, and it expects fewer of them. Standard topics still post every month.
What an AFWERX Open Topic Is
Open topics are SBIR or STTR calls built around a broad mission need instead of a stated technical answer. The Defense Department’s X25.5 solicitation puts the difference plainly: conventional topics “specify the desired technical objective and output,” while open topics adapt commercial products or solutions to close capability gaps or improve existing capabilities.
The Air Force’s version went further than most. Its last two open topics, AFX255-PCSO1 and AFX255-PCSO2, called themselves “truly ‘open’ (agnostic of industry, technology, and problem area).” You brought a commercial product. You named the Air Force or Space Force stakeholder who needed it. Phase I proved the fit.
Phase I wasn’t basic research. The topic said so. It asked you to validate the “product-mission fit” with a stakeholder and to define an actionable plan with the customer, the end user, and the technical point of contact, which is closer to customer discovery than to a lab notebook.
GAO traces the Air Force’s first open topics to 2018. Congress wrote the idea into law four years later. Section 7 of the SBIR and STTR Extension Act of 2022 added 15 U.S.C. § 638(ww), which tells the Secretary of Defense to conduct “not less than 1 open topic announcement at each component of the Department of Defense per fiscal year.”
Read that line again. It sets a floor of one. It says nothing about how open.

Open Topic vs a Standard SBIR Topic
Here’s the comparison, side by side. The left column is the last Air Force open topic. The right is a specific topic from the Department of War’s 2027 SBIR BAA, Release 2.
| Last DAF open topic (X25.5, closed August 5, 2025) | DAF specific topic (2027 BAA, Release 2) | |
|---|---|---|
| Who writes the problem | You do. Any industry, technology, or problem area | A DAF program office, from its own requirement |
| The customer | You find one during Phase I | Named in the topic |
| Phase I limits | $75,000 and 90 calendar days | Set per topic. DAF27BZ02-NV014 and NV015 list $300,000 and 6 months |
| Judged on, most important first | Defense need, technical approach, commercialization | Technical merit, key people’s qualifications, commercial potential |
| Proposals per company | One for the release, to the Air Force or the Space Force topic | One per topic, for every DoW topic since October 1, 2026 |
Figures come from the Air Force’s X25.5 Release 10 instructions and the DoW 2027 SBIR BAA, Release 2, both read on November 25, 2026. Limits change by release. The instructions in force on submission day win.
Look at the judging row. The open topic scored defense need first. A standard topic scores technical merit first. So page one of each proposal has a different job. Show who in the Air Force or Space Force needs this, or show why your approach works.
Where the AFWERX Open Topic Stands Now
We searched DSIP, the Department of War’s SBIR/STTR Innovation Portal, on November 25, 2026. It listed 110 topics that were open or in pre-release. None was an Air Force or Space Force open topic. The two Air Force topics in the 2027 CSO’s Release 2 are specific Space Force topics, and our guide to finding and reading a DoD SBIR topic shows how to run the same search.
AFWERX explained the change in its written Q&A from an April 22, 2026, reauthorization webinar. “AFWERX and SpaceWERX are transitioning to a focused open topic model,” it says, “which replaces traditional open topics with mission-driven subject areas that allow for multiple innovative solutions within a specific capability gap.” Should companies prioritize the Open Topic? The answer was blunt: “There will be a decrease in the number of Open Topic opportunities.”
Was this the 2026 reauthorization? Not on paper. The Small Business Innovation and Economic Security Act extended SBIR and STTR through September 30, 2031, and the phrase “open topic” appears nowhere in it. Subsection 638(ww) is still in the code.
What the act did change is the proposal count. Under its section 4, the DoW now takes one proposal per company per topic, open or conventional, starting October 1, 2026. Our post on what the 2026 reauthorization changes for first-time applicants covers the rest.
Other components still post open topics. The Navy’s Office of Naval Research ran one for low-cost heads-up displays, DON27BX01-NP001, through November 25, 2026. The tool still exists elsewhere.
91 percent and 55 percent: the shares of the Air Force’s FY 2024 open topic and conventional topic awards issued within recommended time frames. Source: GAO-26-108750, Small Business Research Programs, September 29, 2026.
DoD officials told GAO the gap comes from AFWERX issuing open topic awards in-house. The same report found that a higher share of the Air Force’s FY 2019 to FY 2023 conventional Phase I awards moved on to Phase II than open topic awards did, and DoD officials pointed to budget and the pool of eligible proposals. Faster isn’t further.

SpaceWERX and the Space Force Twin
SpaceWERX is the Space Force’s innovation arm and a division of AFWERX. SpaceWERX’s own About page says it’s headquartered in Los Angeles and works in partnership with Space Systems Command’s Commercial Space Office. That’s our region.
In the last release there wasn’t a separate Space Force open topic. There was a twin. AFX255-PCSO2 sat in the same Air Force release, asked for a Space Force stakeholder need, and listed eight mission areas from the USSF Commercial Space Strategy, among them space domain awareness, satellite communications, and PNT, short for positioning, navigation, and timing. It also named missions the Space Force wasn’t seeking commercial help for, such as missile warning and nuclear detonation detection. One proposal, one twin. Never both.
Today SpaceWERX’s name turns up on specific topics. DAF26BX06-DV512, “Cyberspace Warfare for Space,” carried a SpaceWERX tag, took Direct to Phase II proposals only, and closed October 21, 2026. Selling into space? Our guide to doing business with SpaceWERX covers the wider picture.
Planning Around Fewer Open Topics
Here’s the rule we’d use. If a specific topic describes your problem, answer it. Its customer is built in. If nothing fits and your product already has commercial traction, write a two-page adaptation brief now: the Air Force or Space Force need, the gap, what Phase I would prove, and what your sales or pilots already show.
Then keep it current. AFWERX says its 2026 releases kept the usual rhythm of about a month in pre-release and a month open. That’s not long.
Habits that help either way.
- Watch the first Wednesday of each month, when new DoW topics go into pre-release. That’s your window to ask the topic author your questions.
- One topic, one proposal. A second proposal to the same topic replaces the first.
- What disqualifies first-timers most often? Going past the topic’s maximum period of performance, which AFWERX calls the number one grounds for disqualification.
- Army, Navy, or another component. Different instructions, and the 2027 CSO warns that open topic instructions may vary significantly across services.
- Plan for SBIR Phase III follow-on work from the start. It’s funded outside SBIR and can follow either a Phase I or a Phase II award.
Where do we come in? Our SBIR/STTR funding assistance matches technology to open solicitations and offers shaping guidance, technical review, and feedback, not ghostwriting. We’re not a government agency and don’t have contracting authority, so we can’t speak for AFWERX or SpaceWERX. More reading sits in our SBIR/STTR guides.
AFWERX, SpaceWERX, the Air Force, the Space Force, and GAO appear on this page as buyers and sources. Nothing here means any of them endorses or works with the cluster. One naming note: the current solicitations say Department of War, the statutes still say Department of Defense, and we follow whichever source we’re quoting.
Before You Wait for the Next Open Topic
Is an AFWERX Open Topic taking proposals right now?
Not as of November 25, 2026. DSIP showed no Air Force or Space Force open topic open or in pre-release that day, and the last two, one for each service, opened July 2, 2025, and closed August 5, 2025. AFWERX says new opportunities go up on its website and social channels once they’re public.
How is a focused open topic different from the old one?
A focused open topic picks the capability gap for you. AFWERX describes mission-driven subject areas with room for several solutions inside one gap, so you still propose your own approach. What goes away is the any-technology front door.
Does SpaceWERX run its own open topic?
Short answer: in the last release, the Space Force version was a twin. AFX255-PCSO2 sat in the same Air Force release, was offered in partnership with SpaceWERX, and asked for a Space Force stakeholder need. You could pick one twin. Not both.
What did the last Air Force open topic pay for Phase I?
$75,000, for no more than 90 calendar days. Those were the caps in the Air Force’s X25.5 Release 10 instructions, which we read on November 25, 2026. A focused topic will set its own limits, so read the one in front of you.
Can a company send two proposals to the same topic?
It can, but only the last one counts. Since October 1, 2026, the DoW has limited each company to one proposal per topic, open or conventional, and an earlier proposal to the same topic isn’t evaluated. Separate topics count separately.
Do you need an Air Force customer lined up before you propose?
For the last open topic’s Phase I, no, but Phase I existed to find one. The topic asked you to validate product-mission fit with an Air Force or Space Force stakeholder, and AFWERX’s January 2026 program overview lists a Customer Memorandum as a requirement for Open Topic Phase II. Specific topics come with the customer named.
Pick the Right Topic Before You Write
Not sure whether your technology fits a specific topic, an open one, or neither yet? Members get a dedicated point of contact who assesses their needs and routes them to the right expertise. Membership and cluster-funded services are provided at no cost to eligible participating businesses, subject to program requirements and available resources.