SBIR Phase 1 vs Phase 2: amounts, timelines and what each must prove

The money, the months and the proof each phase asks for, side by side from official sources.

Bare radar sensor breadboard on an ESD mat in front of its packaged prototype on a test fixture in an electronics lab

In SBIR Phase 1 vs Phase 2, the difference is scale and proof: Phase I is a short feasibility study, and Phase II is the larger, longer R&D award that builds on Phase I results toward a prototype.

Agencies write the phases in Roman numerals, so the Phase I and Phase II on a solicitation are the 1 and 2 you searched for. Every figure below was read on November 27, 2026, on SBIR.gov, in the SBA’s SBIR/STTR policy directive and in the 2026 reauthorization, with Army, DARPA, SpaceWERX and Navy pages showing how Defense Department components set their own numbers.

It’s one of our SBIR/STTR guides for defense small businesses, written for Phase I teams in Orange, Los Angeles and San Diego Counties who’d rather start the Phase II plan early. Nobody can promise either award. The topic’s own instructions set the real numbers.

Engineer's hands adjusting a mirror mount on a laser optics table during an early feasibility experiment

What SBIR Phase 1 must prove

Phase I buys an answer to one question. Can this work? SBIR.gov’s FAQ sets the objective as establishing “the technical merit, feasibility, and commercial potential” of the work, and judging the small business’s “quality of performance” before any further federal support in Phase II. So the agency is grading your team too.

What a Phase I reviewer weighs

  • Scientific and technical merit, and whether the approach is feasible at all.
  • Commercial potential. The SBIR/STTR policy directive tells agencies to weigh it alongside merit and feasibility when they score proposals.
  • Who does the work? At least two-thirds of the Phase I research has to come from your own firm.
  • Sometimes a Phase II proposal, since the directive lets an agency make one a Phase I deliverable.

Pick the one technical question Phase I has to close. Then cut the rest. A Phase I that tries to build the whole product leaves thin results for the Phase II reviewers who read them next.

What SBIR Phase 2 must prove

SBIR Phase 2 is the program’s main research and development award: a contract or grant, typically 24 months long on SBIR.gov, that continues the work a company started in Phase I and, at Defense components such as SpaceWERX, develops a working prototype for a government customer.

The bar moves. Under the policy directive, the agency decides a Phase II on the results of your Phase I work and on the scientific and technical merit and commercial potential of the new proposal. Every Phase II proposal must carry a succinct commercialization plan. Phase I asked whether it works; Phase II asks who’ll use it.

What changes on paper

  • Your firm’s share of the research drops from two-thirds to at least half, per SBIR.gov.
  • Technical and business assistance rises from up to $6,500 to up to $50,000 per project under Section 7 of the 2026 reauthorization.
  • Open-topic Phase II proposals at AFWERX and SpaceWERX need a signed customer memorandum from a prospective program office and end user. It’s non-binding and commits no funding.
  • No invitation gate: the same directive bars invitation-only Phase II eligibility, so any Phase I awardee may apply.
Technicians in clean-room suits lowering a prototype reaction wheel assembly into a thermal vacuum test chamber

SBIR Phase 1 vs Phase 2, side by side

Two charts drawn to scale, then the full comparison. The caps are the most an agency can award without an SBA waiver. They’re ceilings, not prices.

Award cap without an SBA waiver

Levels as of October 16, 2026, on SBIR.gov.

Phase I$335,937
Phase II$2,239,578

Typical time frame

On a 24-month scale, from the SBIR.gov Apply page.

Phase I6 to 12 months
Phase II24 months

The outlined part of the Phase I bar is the range. Six months at the short end, twelve at the long end.

TopicSBIR Phase ISBIR Phase II
What it’s forShow technical merit, feasibility and commercial potentialContinue the R&D started in Phase I
Typical award on SBIR.gov$50,000 to $323,000$650,000 to $2.2 million
Cap without an SBA waiver$335,937$2,239,578
Typical time frame6 to 12 months24 months
Who can applySmall businesses that meet the program’s rules for the topicGenerally Phase I awardees; Direct to Phase II on some DoD topics
Research your firm performsAt least two-thirdsAt least half
Technical and business assistanceUp to $6,500 per projectUp to $50,000 per project
What decides the awardThe proposal’s merit, feasibility and commercial potentialPhase I results, plus the new proposal’s merit and commercial potential
Extra paperworkThe topic’s standard proposal volumesA commercialization plan in every proposal; at DARPA, a transition and commercialization strategy of up to 5 pages
What it ends withFeasibility results and a final reportOften a working prototype, at components such as SpaceWERX

Sources: the SBIR.gov Apply, About and FAQ pages, the SBIR/STTR Policy Directive (effective May 3, 2023), Section 7 of the 2026 reauthorization and DARPA’s September 2026 Phase II instructions. Read November 27, 2026. Your topic’s instructions control.

Four topic instruction packets of different thickness side by side on a workbench beside a carbon drone arm

DoD components set their own Phase 1 and Phase 2 numbers

SBIR.gov’s ranges are program-wide. Inside the Defense Department, each component writes its own limits into its instructions. They don’t match.

  • Army: Phase I runs three to six months for up to $250K, and Phase II 18 to 24 months for up to $2 million, according to the Army SBIR program’s phase page.
  • DARPA’s Phase II instructions, dated September 21, 2026, put a typical award at $1,800,000, built as a $1,000,000 base of 18 to 24 months plus an $800,000 option of 6 to 12 months.
  • $75K to $180K over 3 to 12 months for Phase I, then $1.25M to $1.8M over up to 24 months for Phase II: that’s the range SpaceWERX publishes for Space Force topics.
  • Navy? Its FY-27 Release 2 listed 20 conventional SBIR Phase I topics and 4 Direct to Phase II topics.

Same program, four sets of numbers. Size the budget from the component’s instructions inside the topic, and our guide to finding, reading and choosing a DoD SBIR topic shows where those sit.

Building the Phase 2 case while Phase 1 runs

Your Phase I results are the Phase II evidence. Planning starts in month one, not after the final report.

Line these up before Phase I ends

  • The Phase II proposal date. The policy directive lets agencies set it in the solicitation or negotiate it with individual Phase I awardees, and DARPA sends a submission notification with its own deadline.
  • Measured results against the question you set, not a summary of effort.
  • A buyer. At AFWERX and SpaceWERX open topics that’s the signed customer memorandum; elsewhere it’s a program office and an end user who’ve seen the work. Our post on turning SBIR technical results into outcomes a buyer cares about covers the framing.
  • Accounting that can carry a larger award, since DARPA warns a Phase II contract can be delayed without an adequate accounting system.

Some teams skip Phase I. Direct to Phase II lets DoD fund a Phase II without a prior Phase I when the agency finds feasibility already shown, and Section 3 of the 2026 reauthorization created a strategic breakthrough Phase II of up to $30 million, over as long as 48 months, for a company with at least one prior Phase II and matching funds.

Members can bring that plan to our SBIR/STTR Funding Assistance team, which helps you “match your technology to open solicitations, shape your proposal, and get expert technical review and submission support from Phase I through Phase III.” We don’t ghostwrite. Nobody outside the agency can promise a Phase II.

Visitors watching a prototype ground robot climb a ramp on an indoor test course, seen from behind

SBIR Phase 2 in four official figures

Each one links to its source, read November 27, 2026.

$1.8M

DARPA’s typical Phase II award

Source: DARPA Phase II instructions, September 21, 2026

24 months

Typical Phase II time frame

Source: SBIR.gov Apply

1/2

Least Phase II research your firm performs

Source: SBIR.gov FAQ

$50,000

Phase II assistance ceiling per project

Source: S. 3971, Section 7 (2026)

Read next, phase by phase

Four pieces for the road from Phase I to Phase III.

Phase I size and schedule

Our post on SBIR Phase I award size and timeline walks the DoD schedule from topic release to kickoff.

Results a buyer reads

Phase II reviewers weigh commercial potential, so learn how to turn technical results into buyer outcomes early.

A Phase I proposal template

If you’re still drafting Phase I, start from our SBIR proposal template and checklist for a first submission.

What follows Phase II

Our SBIR Phase III guide explains follow-on awards paid from outside the SBIR budget, sole source included.

SBIR Phase 1 vs Phase 2: six answers for Phase I teams

Can a company skip Phase 1 and go straight to Phase 2?

On some DoD topics it can, through Direct to Phase II. Under the policy directive, the agency has to find that your feasibility is already shown without a prior Phase I award.

Navy’s FY-27 Release 2 listed four such topics. At SpaceWERX, an open-topic Direct to Phase II applicant also needs a signed customer memorandum.

Does winning Phase 1 lock in a Phase 2?

Nothing is locked in. The agency weighs your Phase I results along with the merit and commercial potential of the Phase II proposal.

Every Phase I awardee may apply, since the policy directive bars invitation-only eligibility. Applying isn’t winning.

Why is Phase 2 so much bigger than Phase 1?

Phase II pays to build and test the thing, not to ask whether it can work. At the SBA’s no-waiver levels on SBIR.gov, that’s up to $2,239,578 against $335,937.

Do the subcontracting limits change between phases?

Two-thirds, then one half. That’s the least of the research your own firm must perform in Phase I and then in Phase II, per SBIR.gov’s FAQ.

STTR splits the work differently, with a research institution as a formal partner, and our SBIR vs STTR guide covers those rules.

How long is the gap between Phase 1 and Phase 2?

Your agency and topic decide that, not the program. Agencies can set Phase II proposal dates in the solicitation or negotiate them with individual Phase I awardees.

DARPA’s September 2026 instructions put the department’s goal for a Phase II award at 180 calendar days from the proposal deadline, and they warn that a weak accounting system can delay the contract. Plan cash for the wait.

Will the cluster write our Phase 2 proposal?

The cluster doesn’t ghostwrite proposals. Members get shaping guidance, technical review and feedback, and the proposal has to reflect your company’s actual capabilities and research plan. What you control is the evidence.

Map the road from Phase 1 to Phase 2 with the cluster

Membership and cluster-funded services are provided at no cost to eligible participating businesses, subject to program requirements and available resources.